Project Summary

MYTILINEOS, in Consortium with Siemens Energy Global GmbH & Co. KG and Siemens Energy sp. z o.o., undertakes the construction of a combined-cycle gas turbine (CCGT) power plant project in Grudziadz, Poland.

Specifically, the Consortium has signed an Engineering, Procurement and construction (EPC) contract with SPV CCGT Grudziądz Sp z o.o. (owned entirely by Energa S A, part of Orlen Group) to construct an efficient power plant in combined cycle technology (CCGT) of net electric power in the range of 560 MW, consisting of one gas turbine and one condensing steam turbine, using a closed, wet mechanical draft cooling tower arrangement and construction of a gas installation in the Power Plant area with accompanying infrastructure.

The CCGT is expected to enter commercial operation in 38 months after the signing of the contract.

The contract price for MYTILINEOS amounts to app. 202 million Euros.

BRIEF DESCRIPTION PDF 147KB

GAS TURBINES / COMBINED CYCLE

Open Cycle Gas Turbine (OCGT) Power Plant of 299MW, Immingham - North Lincolnshire, United Kingdom

MYTILINEOS Energy&Metals undertakes the development of an open-cycle gas turbine (OCGT) power plant project in Immingham of North Lincolnshire in the United Kingdom, for VPI Immingham -B LLP (VPI-B), a non-consolidated group entity of Vitol .

VIEW MORE